Monday, March 6, 2017

February progress

There are only two or three less days in February than the other months, but it felt so much shorter!  Anyway, here's some of the progress from February and some of the plans for March.

1. Riley Blake Challenge.  I have the idea drawn out and ready to go.  My goal for March is to (start and) finish piecing this.  It's a busy month, so we'll see how it goes.



2. Meshing solid HSTs.  I have the HSTs all sewn together and the background on some.  The picture below is a few of the rows.  (After taking the picture I put it all away.  After my big clean three weeks ago my area is still clean!)


3. Temperature quilt.   I'm half way through February, although only January is shown.  The months go rather quickly, so I'll probably catch up sometime soon.


4. Quilt nautical quilt. The quilting is done and I just need to deal with loose threads!
                          
Other items still waiting around
5. Rainbow log cabin.  
6. Simply solids bee quilt.   
7. Sunset wall hanging. 
8. scrap quilt #2. 
9. Scrap quilt.  
10. Orphan rocket block. 
11. Jeweled floors.
12. Lost piece (almost whole cloth quilt).  
13. Winter quilt.   
14. fabric from Christmas.   
15. A pillow with green/purple fabric.
16. green/white hourglass quilt.
17. baby boy quilt - possibly pair with another quilt on the list.
18. woodlands quilt.
19. Trying to fit in - left over triangle quilt. 
20. baby quilt - possibly pair with another idea TBD