Showing posts with label Quilt 64. Show all posts
Showing posts with label Quilt 64. Show all posts

Thursday, July 9, 2020

Meshing triangles: finished

I've been working on this quilt for quite a while.  It doesn't have a recipient in mind, so it kept getting put on the back burner.  (Actually, I periodically wonder if I could enter it in a show.)

I've called it Meshing Triangles because each color has it's own region, but those regions overlap with several other color regions.   (So, for example, if you look at the top you see the green and orange region.  But if you look two rows down you have an orange-yellow region and a green-purple region.)

I made it with scraps, so how much I actually had of a color needed to be factored in too.  Some of the Kona colors I used include: thistle, nautical, honeydew, lavender, mediterranean, holly, highlight, primrose, carrot, rich red, and medium grey.

I went "all out" on the quilting and did either an up/down or across in the color of the triangle.  So all the HSTs got two colors.  Most of the time I could keep one color always going the same direction, but there were a few places that it needed to switch.  The outside grey just got alternating directions and not the cross-hatch. 

It was a lot of ends to bury, but it was during a productive streak when I was getting all sorts of quilting goals accomplished.

Wednesday, January 15, 2020

Q1 - 2020

Last quarter was surprisingly productive!  I'm not really sure what the difference was from previous quarters, but I'll take it!  I dropped my number of WIPs from 16 to 14 and even made progress on eight of those!

So the QAL has moved solely to instagram. It's probably a good move on their part, but I tried Instagram and honestly, didn't love it.  I think there are several reasons for that, which I'm not going to go into here.  So I'm trying to decide what I'm going to do...I could go back to the monthly one, I could still participate in the QAL on Instagram, or I could not do anything.  In the meantime, I'm going to publish my Q1 list because I find it useful for myself as I keep track of where all the projects are.


1. Meshing solid HSTs: I just finished binding it (by hand!) and need to take pictures.


2. Stash Bee 2019:  The blocks are put together and it is on the quilter.

3. Scrap bee blocks 2017: The backing is all done; I just need to quilt it now.  (No picture because I couldn't find the backing.  I think it's in my pile of big stuff (backings, almost finished things, etc.) but since I couldn't easily find it and I'm not linking up to anything, I gave myself a pass.)

4. Rainbow Log Cabin.  After debating for way too long, I made a winter side too.  It needs to be quilted.



5. Winter quilt.  I started this, but am just not feeling it.  I think it'll look neat when finished, but am having a hard time staying motivated.  I've been finishing up other items in the meantime, so it still all works out.

6. Black scrap quilt.  I finally trimmed it up and it is ready for binding.  I'm planning on getting the binding fabric today.

7. Quilt for Ryan.  This was finished a few days ago and just needs some pictures.


8. Red quilt (stash bee 2020).  I have January...I finished one block and the rest are slowly coming in!  I'd like to give this as a baby quilt for a baby around February or March. 

Items that I haven't worked on for a while, but maybe this will be the quarter for them!

9. Temperature quilt.  I need to quilt this.  It's from 2017, so it's rather low on the priority list.


10. Scrap quilt. It needs to be quilted.  Along with so many other things.  It has actually been started, but then I took it off due to other priorities and it hasn't been put back on for a while.


11. Green stripes.  This isn't square.  I don't really know how to square it up well (or easily), so it's been sitting around for a long time.


Things that don't count for the Finish-a-long but I want to remember them:
12. Jeweled floors
13. Trying to fit in - left over triangles
14. Fabric from Christmas

Tuesday, January 15, 2019

Q1 FAL

I'm going to try the quarterly finish along this year.  I feel like that's about as often as I've been posting progress updates anyway, so it might be more fun with others.


1. Baby boy quilt (HCP): Piecing is complete and it is the next one up on the quilting frame.  I just oiled the sewing machine, so hopefully everything will run very smoothly!  After I took the picture I realized I don't love this as much as I thought I would.  I love, love, love the individual fabrics, but should have included some solids.  Oh well...I'm not going to change it now.


2. E's quilt: She is almost five years old and needs a new quilt!  We went to the fabric store and she had lots of fabric that she liked, but she seemed to gravitate towards brights, rainbows and flowers.  Her mom wants it to be able to grow with her.


3. Meshing solid HSTs: This needs to be quilted.  Densely, so the grey variations aren't so prominent.


4.  Scrap bee blocks 2017: This got all put together and now needs to be quilted.  I also want a scrap backing, so that needs to be pieced.


5. Temperature quilt.  I need to quilt this.  It's from 2017, so it's rather low on the priority list.

6. Rainbow Log Cabin.  I need to decide what to do with this.  I was thinking of making it reversable.  If I don't want to do that, I need to just finish it up!


7. Scrap quilt. Surprise, surprise, it needs to be quilted.



8. Winter quilt.  I have the fabric and an idea for the pattern.  It involves triangles and a sketch is somewhere on the blog.



9. Pillow with green/purple fabric.  I just want to make an easy pillow.  I just need to do it.



10. Black scrap quilt.  This is so close to being finished.  I want to square it up before binding, and the task seems daunting.



11. Wedding quilt left over HST II.  While I don't have a pattern in mind yet, finding one for HSTs will be pretty easy.  I was considering adding in some pink to have a pre-made girl baby blanket.


12. Green stripes.  This isn't square.  I don't really know how to square it up well (or easily), so it's been sitting around for a long time.



Things that don't count for the Finish-a-long...
13. Wedding Quilt left over HST: This needs to be washed and have pictures taken!
14. Jeweled floors

15. Wedding quilt pillows
16. Quilt for Ryan  
17. Trying to fit in - left over triangles
18. Fabric from Christmas


 

Saturday, December 1, 2018

Progress through November

It's odd how things can change so quickly.  Two months ago I felt like I was getting nothing done, but since then I've finished several quilt tops.  One month ago I felt like I didn't have much on the "to quilt" list, and now I have a bunch!

So here's what I've been up to...
1. Meshing solid HSTs: I finally got the last bit of medium grey that I needed to finish.  Unfortunately, it looks slightly different.  Fortunately, I was planning on a dense quilting in the grey part, so hopefully that will bind it together better.



2. Fish quilt: Quilting and pictures are all done and it just needs a blog post.

3.  Scrap bee blocks 2017: This got all put together and now needs to be quilted.  I was going to piece a back together, so I need to do that too.

4. Purse: Just needs a blog post...I feel as though I should be more of top of these blog posts.
 

5. Joshua robot pillowcase: Finished, and I'm not giving it it's own blog post. :) It's just a normal pillowcase, made out of left over minky from his quilt backs.  He loves it since it is soft and has robots.

6. Wedding Quilt left over HST: This turned out so much better than I had envisioned it.  It will be the next quilt I work on quilting.
 

7. Baby boy quilt (HCP): I started piecing a new quilt.


Things I haven't worked on recently (or haven't started yet):
8. Temperature quilt. 
9. Rainbow Log Cabin
10. Scrap quilt #2
11. Jeweled floors
12. Lost piece
11. Winter quilt
13. Fabric from Christmas
14. Pillow with green/purple fabric
15. Trying to fit in - left over triangles
16. Black scrap quilt.
17. Baby quilt (B?P)
18. Wedding quilt pillows
19. Wedding quilt left over HST II

Thursday, May 31, 2018

Progress from May

May was surprisingly productive!  I'm not sure why: maybe I just worked on more projects than normal so it felt more productive or maybe I was close to milestones for several quilts and that's what made it productive.  In any case, I'll take it!

1. Robot quilt: Finished and in use!  I just need to get some 'official' pictures.


2. Bee blocks 2018 (HDD): I received the last of these yesterday, and quickly got them put together.  I was looking for something to get on the quilter soon, so this will be perfect.


3. Meshing solid HSTs:
I've been excited about this one for a while, but other things have taken priority.  I need a bit more grey to finish up the background.


4.  Scrap bee blocks 2017.  I got started on these, but they're probably going to go back on the back-burner next month.  It was nice to make some progress though.
 
5. Baby unknown quilt (CKJ): Done, I just need to get the 'official' pictures of this one too.

6. Wedding quilt (JEM): I have 100/525 HSTs finished.  It's going to be huge and I'm not feeling as confident with the design as I often do. 


Things I haven't worked on recently (or haven't started yet):

7. Temperature quilt. 
8. Rainbow Log Cabin
9. Scrap quilt #2
10. Jeweled floors
11. Lost piece
12. Winter quilt
13. Fabric from Christmas
14. Pillow with green/purple fabric
15. Trying to fit in - left over triangles
16. Black scrap quilt.
17. Quilt Halloween quilt
18. Baby boy quilt (ZJN)
19. Joshua robot pillowcase

Monday, March 6, 2017

February progress

There are only two or three less days in February than the other months, but it felt so much shorter!  Anyway, here's some of the progress from February and some of the plans for March.

1. Riley Blake Challenge.  I have the idea drawn out and ready to go.  My goal for March is to (start and) finish piecing this.  It's a busy month, so we'll see how it goes.



2. Meshing solid HSTs.  I have the HSTs all sewn together and the background on some.  The picture below is a few of the rows.  (After taking the picture I put it all away.  After my big clean three weeks ago my area is still clean!)


3. Temperature quilt.   I'm half way through February, although only January is shown.  The months go rather quickly, so I'll probably catch up sometime soon.


4. Quilt nautical quilt. The quilting is done and I just need to deal with loose threads!
                          
Other items still waiting around. 
5. Rainbow log cabin.  
6. Simply solids bee quilt.   
7. Sunset wall hanging. 
8. scrap quilt #2. 
9. Scrap quilt.  
10. Orphan rocket block. 
11. Jeweled floors.
12. Lost piece (almost whole cloth quilt).  
13. Winter quilt.   
14. fabric from Christmas.   
15. A pillow with green/purple fabric.
16. green/white hourglass quilt.
17. baby boy quilt - possibly pair with another quilt on the list.
18. woodlands quilt.
19. Trying to fit in - left over triangle quilt. 
20. baby quilt - possibly pair with another idea TBD

Saturday, February 11, 2017

interlocking HST progress

I finally all the HSTs made and trimmed, so I started laying out.  The first layout didn't go very well.  The second layout I tried to make more controlled, but that looked ugly.  My third try looked ok.






I stepped away for a bit and then tried again.  I'm much happier with this one.  I had a better starting seed and realized how to make the colors flow between pairs better.  Taking that first picture was a huge help.




I need to make just a few more HSTs to integrate in between some of the awkward spots.  There will also be quite a bit of negative space, but I think that'll look nice.

I also laid it out in an out of the way hallway, so for once I'm somewhat optimistic that it won't get trampled on.


What I need to make, for my own purposes:
4x dark blue, med purple
2x dark blue, orange
4x light green, light orange
3x med red, med light blue
2x med dark blue, med green
4x pink, light blue

Sunday, February 5, 2017

January recap

1. Aunt's quilt. I put this on the quilter about half way through January.  The quilting is almost done - maybe one or two more nights, threads need to be buried and the binding attached.  Finishing it is my February goal.
 
2. Rainbow log cabin.  It's all put together!  It's for me, so I'm afraid it is low priority to get on the quilter.
 
3. Simply solids bee quilt.  Piecing is finished, but it isn't very square. I was going to quilt and then square it up, but after looking at the picture I may try to square it up first.  It's my current problem child.

4. Meshing solid HSTs.  I made a bunch of HSTs and am now trimming them up.  (The picture is from earlier when I paired all the colors together.  It should be more like a rainbow then the picture shows.)

5. Temperature quilt.  I'm staying pretty up-to-date with January completed.  Catching up is pretty fast, so I tend to do a week at a time.                               

Other items still waiting around. 
6. Sunset wall hanging.  I just have the half the binding left to do. It's getting finished, still slowly but steadily.  I also have to bury some threads in the back.
7. scrap quilt #2. 

8. Scrap quilt.  

9. Orphan rocket block. 
10. Jeweled floors.

11. Lost piece (almost whole cloth quilt).  

12. Winter quilt.   

13. fabric from Christmas.   

14. A pillow with green/purple fabric.

15. Quilt nautical quilt.
16. green/white hourglass quilt.

17. baby quilt - possibly pair with another quilt on the list.

18. woodlands quilt.

19. Trying to fit in - left over triangle quilt. 

20. Riley Blake Fabric Challenge.  I have the fabric and ideas are in my head, but nothing for sure yet.
21. baby quilt - possibly pair with another idea TBD 

Hmm, my number seems to be going up instead of down.  Oh well, it's only the beginning of February!