1) My niece's quilt, which was made by my mother-in-law. I was asked if I'd have it done by Christmas, and gave a 75% chance of completion. I then found out that my niece has been asking for it, so I thought I'd try really hard to get it done. I counted 36 parts, which meant if I did two per day I'd have it done on the 19th. I'm currently about a day ahead because the white portions go rather quickly and some are small. It's probably good that I'm a bit ahead because I didn't take into consideration taking it off the frame and checking for thread ends that still need to be buried.
2) Urban cabin is a finished top. I only had about five long seams left and was getting tired of stepping over it all the time.
3) Metro lattice and pillow. This quilt is super close to being finished, but I'm getting some nice tags for Christmas and decided to wait to finish the binding. I also made a coordinating pillow to go with it using the scraps. It's my first pillow and it turned out pretty well. (The back is shown here.) (So is my son, giving it a thumbs up.)
Linking up with WIP Wednesday.
Love how the color gradates in your urban log cabin!
ReplyDeleteGreat projects. Good luck staying on track with the niece's quilt!
ReplyDelete