I was part of a quilting bee this year. This bee is exactly what I was looking for in a bee. The rules and guidelines are there, but there are few limitations on what you can choose for your block. I received all my blocks within two months and the last person was in communication and so I knew that she just needed more time. (It seems like a small thing, but previous bees haven't gone that well. Not bad, but this one has been the best.) It might have been fun if hive had been a bit more social, but it's not as though I did anything to promote that and everyone, including myself, is busy. I'm hoping to do it again next year and will find out in December if I got in.
This year I choose a random HST in grey scale with pops of color.
I asked for the other members to use at least three different shades in the white to black spectrum, all solids. Because I do love my solids. One of the triangles was to be a different color. I did let them know that it was going to be for a boy, so that's why there are more blues than some of the other colors.
People also sent enough extras for me to make an additional long row. There was a reason at the time I added the extra row...maybe to balance out the shades a bit? I don't remember, but since I can't tell I'm going to assume that it worked well.
The squares all lined up very well. It helped to have nesting seams, but apparently my bee-mates were also great at the quarter inch seam.
I backed it with grey minky and bound it in sateen, per normal. For quilting I did wavy lines, except for the colored triangles. In those I did some pebbles. It was nice and fast, something I was looking for after the previous quilt, while still having in interesting element.
Linking up with Finish It Up Friday.
Showing posts with label Quilt 61. Show all posts
Showing posts with label Quilt 61. Show all posts
Monday, November 21, 2016
Sunday, November 6, 2016
October recap
1. bee hive scrap something - baby girl quilt. My goal for November is to figure out a design and sew the top together. I previously thought I had about 540 HSTs, but I really have about 280. I'm not sure where my math went wrong. :p Anyway, that's not quite big enough for a baby quilt, so I'll add in some plain squares too.
2. Baby quilt (boy). This is almost done; I need to put on the binding and bury a few threads. Hurray!
3. Aunt's quilt. I've put a few rows together. Nothing exciting but it is at that stage where it will suddenly become a top before expected.
Other items still waiting around...or newly added.
4. scrap quilt #2.
5. Scrap quilt.
6. Simply solids bee quilt.
7. Rainbow log cabin.
8. Orphan rocket block.
9. Jeweled floors.
10. New purse
11. Lost piece (almost whole cloth quilt).
12. Winter quilt.
13. fabric from Christmas.
14. A pillow with green/purple fabric.
15. Sunset wall hanging.
16. Quilt nautical quilt.
17. A few simple pillows to go with the wedding quilt
18. Quilt HI quilt
2. Baby quilt (boy). This is almost done; I need to put on the binding and bury a few threads. Hurray!
Other items still waiting around...or newly added.
4. scrap quilt #2.
5. Scrap quilt.
6. Simply solids bee quilt.
7. Rainbow log cabin.
8. Orphan rocket block.
9. Jeweled floors.
10. New purse
11. Lost piece (almost whole cloth quilt).
12. Winter quilt.
13. fabric from Christmas.
14. A pillow with green/purple fabric.
15. Sunset wall hanging.
16. Quilt nautical quilt.
17. A few simple pillows to go with the wedding quilt
18. Quilt HI quilt
Saturday, July 2, 2016
Recap of June
1. Pluses quilt for Baby boy. Finishing this up is my July goal. I need to bury some thread ends and bind. The baby is due late July, so hopefully it'll be all ready by the time he arrives. (This is my oldest work in progress - started over four years ago.)
2. Wedding quilt. The middle blocks are almost done, along with some of the outside blocks. This is my main piecing project at the moment, but once the blocks are done I'm going to move to something else for a bit.
3. bee hive scrap something. Everything is all trimmed up! I know that my layout needs to be 20x27ish...next step is to figure out a layout.
4. Baby quilt (boy). I'm going to use the Stash Bee blocks I get from this month to make this. The baby was just born, but hopefully I can get this out quickly once the blocks are in.
5. QDAD challenge piece. I have a layout and the fabric. This is the next main piecing project.
6. The bee hive quilt. I just put this on the quilter. I am putting loops on it...a nice fast motif, and the loops remind me of wind. It's appropriate since the block is called spin wheel.
Other items still waiting around.
7. scrap quilt #2.
8. Aunt's quilt.
9. Scrap quilt.
10. Sunset wall hanging.
11. Simply solids bee quilt.
12. Rainbow log cabin.
13. Orphan rocket block.
14. Quilt nautical quilt.
15. Jeweled floors.
16. Lost piece (almost whole cloth quilt).
17. Winter quilt.
18. fabric from Christmas.
19. Kids' quilt.
20. A pillow with green/purple fabric.
I'm down one item from last month...but I have hopes of getting at least two things completed this month! We'll see how it goes.
2. Wedding quilt. The middle blocks are almost done, along with some of the outside blocks. This is my main piecing project at the moment, but once the blocks are done I'm going to move to something else for a bit.
3. bee hive scrap something. Everything is all trimmed up! I know that my layout needs to be 20x27ish...next step is to figure out a layout.
4. Baby quilt (boy). I'm going to use the Stash Bee blocks I get from this month to make this. The baby was just born, but hopefully I can get this out quickly once the blocks are in.
5. QDAD challenge piece. I have a layout and the fabric. This is the next main piecing project.
6. The bee hive quilt. I just put this on the quilter. I am putting loops on it...a nice fast motif, and the loops remind me of wind. It's appropriate since the block is called spin wheel.
Other items still waiting around.
7. scrap quilt #2.
8. Aunt's quilt.
9. Scrap quilt.
10. Sunset wall hanging.
11. Simply solids bee quilt.
12. Rainbow log cabin.
13. Orphan rocket block.
14. Quilt nautical quilt.
15. Jeweled floors.
16. Lost piece (almost whole cloth quilt).
17. Winter quilt.
18. fabric from Christmas.
19. Kids' quilt.
20. A pillow with green/purple fabric.
I'm down one item from last month...but I have hopes of getting at least two things completed this month! We'll see how it goes.
Subscribe to:
Posts (Atom)












